Public Meeting for SR 79 Resurfacing Project
Citizens are encouraged to attend the virtual meeting at www.nwflroads.com/virtualmeetings Those who are unable to participate virtually may attend the meeting in-person at the Ebro Dog Park Restaurant, 6558 Dog Track Road, Ebro. Pre-registration is required for the virtual format and encouraged for in-person attendees. The same materials will be presented for each format.
The intent of this project is to resurface all existing travel lanes, auxiliary lanes, median crossovers, and paved shoulders. Additional improvements include:
- Improving drainage to alleviate historical flooding.
- Realigning the median opening with a southbound acceleration lane at Borrow Pit Road.
No additional right-of-way is required. Bids for construction are scheduled to occur fall 2024.
Maps, drawings, and other information will be on display. FDOT representatives will be available to discuss proposed improvements, answer questions, and receive comments.
This meeting is being held without regard to race, color, national origin, age, sex, religion, disability, or family status.
For more information visit the Florida Department of Transportation District Three on the web at www.nwflroads.com, follow them on Twitter @myfdot_nwfl and Instagram @myfdot_nwfl, like them on Facebook at MyFDOTNWFL, or subscribe to them on YouTube @MyFDOTNWFL.
Angela Small
Radio Production Assistant